Address
ebm-papst Mulfingen GmbH & Co. KG
Bachmühle 2
74673 Mulfingen

Work carried out between
16.04.2008–27.05.2008

Works
New construction of outdoor steps

Materials
AquaDrain®SD steps drainage Type 1
Watec®BW expansion joint strip
AquaDrain®SD water guidance strip
PCi Pavifix® drainage and screed mortar
PCi Carraflott® thin medium and pourable bed mortar

Company
Björn Käfer
Fliesen Mosaik
Unterhofer Str. 22
74653 Künzelsau

Entrance to company building using AquaDrain® SD

Entrance to the company building using  AquaDrain® SD
The AquaDrain® SD1 steps drainage is laid from top to bottom.
Entrance to the company building using  AquaDrain® SD
After preparing the steps (fall min. 1%, sides raised by AquaDrain® SD water guidance strips and seal if required), the AquaDrain® SD Type 1 steps drainage is cut to size and fixed onto the steps with strip-shaped fixing (MS polymer adhesive).
Entrance to the company building using  AquaDrain® SD
Mortar is now spread on the upper and lower riser and tread edges. Bonding increases mechanical load capacity. Afterwards a suitable bonding bridge is applied to the full surface of the treads on the back.
Entrance to the company building using  AquaDrain® SD
The tread is now installed in the fall and hammered into the single-grain mortar.
Entrance to the company building using  AquaDrain® SD
The elements must not overlap when they meet. Corner joints are covered with the Watec® BW expansion joint strip. The AquaDrain® SD stainless steel steps grid must be embedded in such a way as to be surrounded with mortar on all sides.
Eingang Firmengebäude mit AquaDrain® SD
Entrance to the company building using  AquaDrain® SD